WORKS
Formwork for 40 m post-tensioned 10 000 kN HSRW girders
Formwork for 40 m post-tensioned 10 000 kN HSRW girders. Inner articulated mould on spine beam and outer de-moulding shell Chikhodra, Gujarat casting site - INDIAThe inner mould (core) relies onto a central spine beam and hydraulically packs after girder curing and...
Independent silos mounted on frame bases
Independent silos mounted on frame bases. On site measurements and computational analyses for revamping. PIZZAROTTI factory – Ponte Taro (PARMA) - ITALYSilos contain cement and their capacity is 50 tons each. Edilab developed the whole project. on site measurements...
Twin Trolleys for 910 ton segment transport
Twin Trolleys for 910 ton segment transport Main span erection of New Bridge on St. Lawrence River City of Montreal – CANADAThe two trolleys have a rack and sprocket driving system.They run on the bottom flange of an H-shaped beam under already assembled...
Swan River pedestrian bridge
Swan River pedestrian bridge Erection concept and validation analises City of Perth – AUSTRALIAThe structure is designed as a 3-span steel cable-stayed bridge, with the two piers in the river bed.Spans length: 94.5 – 165 – 94.5 mMax height: 72 mThe bridge structural...