Formwork for 40 m post-tensioned    10 000 kN HSRW girders

Formwork for 40 m post-tensioned 10 000 kN HSRW girders

Formwork for 40 m post-tensioned 10 000 kN HSRW girders. Inner articulated mould on spine beam and outer de-moulding shell Chikhodra, Gujarat casting site – INDIA The inner mould (core) relies onto a central spine beam and hydraulically packs after girder curing...
Independent silos mounted on frame bases

Independent silos mounted on frame bases

Independent silos mounted on frame bases. On site measurements and computational analyses for revamping. PIZZAROTTI factory – Ponte Taro (PARMA) – ITALY Silos contain cement and their capacity is 50 tons each. Edilab developed the whole project. on site...
Twin Trolleys for 910 ton segment transport

Twin Trolleys for 910 ton segment transport

Twin Trolleys for 910 ton segment transport Main span erection of New Bridge on St. Lawrence River City of Montreal – CANADA The two trolleys have a rack and sprocket driving system.They run on the bottom flange of an H-shaped beam under already assembled...
Swan River pedestrian bridge

Swan River pedestrian bridge

Swan River pedestrian bridge Erection concept and validation analises City of Perth – AUSTRALIA The structure is designed as a 3-span steel cable-stayed bridge, with the two piers in the river bed.Spans length: 94.5 – 165 – 94.5 mMax height: 72 mThe bridge structural...